first ad

Tuesday, January 9, 2018

Nepal became the first signature bridge in Narayani river

Nepal's first signature bridge will be constructed in the Narayani River, which connects the Gantkot of Chitwan and Nawalparasi.

An attractive and artistic bridge has been constructed using more advanced technology than in the Karnali Chisapani. With the help of Chinese technology, the bridge under the road department under the road department is preparing the initial sample of the bridge.

The bridge will be constructed on a double lane. The bridge will be 500 meters long. It is estimated that a bridge worth Rs. 1 lakh is spent on construction of the bridge. The bridge constructed in the Narayani river will be attractive as a tourist.

Deputy Director General Arjunjung Thapa told the police that the construction of four lanes to build two fine linen and Devghat in the current phase of construction should be constructed.

Such a bridge has a technical understanding of the flow of water. Environmental approach will also protect the environment. If the government has kept the roads and bridges connected to Chitwan-Nawalparasi in urban infrastructure, the Pre-West Highway is ready to turn from Devghat around the highway. Such a situation will be made to change the East-West Highway and bridge four lanes.

In the night, during the night, a charming lamp has been made to make a plan. During evening or in the morning, various religious songs will be found in the palace. Due to the holy pilgrimage of the Devghat Hindu Dharmavamba, the bridge has become a tourist attraction.

The Karnali Bridge contributed significantly to the tourism promotion of Nepal, such as the bridge connecting Chitwan Nawalparasi will be made similar to the same. The bridge will be constructed with the help of Chinese technologies. According to senior department engineer Nareshman Shakya, the department has prepared for preparing environmental impact assessment. According to Shakya, using the latest technology has been set to design the bridge and enable Nepalese technicians to compete and strengthen.

The department also maintained the goal of learning Chinese skills and targeting Chinese technicians, adding that the Chinese high technology was also targeted. The Ministry of Physical Infrastructure and Traffic has also been preparing for the construction of the bridge. Chitwan-Nawalparasi bridge bridge is currently 460 meters long. The same signature bridge will be constructed on the Medi and Sethi river. Siddiqui Shakya, who has been designated with it also, said.

No comments:

Post a Comment

how to identify fake notes FOR NEPAL

How to identify fake n How to identify fake notes- 1- Red mark area in the red Mark area- pic is written in the black area of ​...